Drainage Network Installation and Rehabilitation Works
03 December, 2025
Rehabilitation of the Drainage separator near Mtkheta Street N4 is underway. Additionally, 24 stormwater catch basins and 12 linear meters of non-standard side inlets are being installed.
The corresponding works are being carried out by employees of Tbilservice Group LLC on the instruction of Tbilisi City Hall.
Once the drainage system is renovated, surface water accumulation in the surrounding area will be effectively eliminated.